Andheri East, Mumbai
1,00,000 sq ft
Hospitality
Energy Savings
Energy savings of 19,157 kWh, corresponding to 7% over its baseline benchmark.

Challenge:

Hilton Mumbai was facing an array of complex challenges in managing HVAC operations using its existing Building Management System (BMS). The Facility Management Team needed more than just a conventional BMS, seeking to transition from manual to fully automated HVAC operations. The team was in search of a best-in- class integrated solution that could offer enhanced control, visibility, and energy savings. Additionally, it required a solution that could facilitate remote management of its HVAC operations.

Solution:

Installation and Execution

Installation and commissioning at a hotel near Mumbai International Airport can be challenging due to the constant flow of travelers and high occupancy rates. However, 75F's out-of-the-box IoT-based BMS suite is known for its quick turnaround time, retrofit-friendly design, and ability to optimize HVAC operations in existing buildings. The installation team had to wait for the opportune moment when the AHUs were shut down to comply with operational requirements. Displaying patience, the 75F team efficiently deployed necessary solutions within a brief window of time.

 

Results:

Energy Savings

The Hilton Mumbai installation began in mid-June of 2023 and was completed by the end of October 2023, taking a total of just 4 months for installation and commissioning. Energy data started flowing from January 2024 onwards. In January, the 75F solution saved 19,157 kWh of energy on the Chiller plant and AHUs, amounting to a 7% saving over the baseline benchmark.

 

Fast and Easy Installation

The deep knowledge and rich expertise of the 75F installation and technical teams supported the Hilton facility management team with rapid installation, with just over 120 days for the installation and commissioning of the entire Hotel.

 

Energy Management Dashboards

To give complete visibility on all the key performance energy parameters, 75F’s Managed Services delivered customized dashboards to the Hilton facility management team.

Managed Services

75F's Managed Services Team took care of the complete site post-commissioning and made sure that the site operated at peak levels of energy efficiency.

 